Consultation

  • Determine which HI-Fog System is most suitable for the hazard
  • System design of water mist system
  • System design of fire detection portion of system
  • Prepare ACAD drawings
  • Install the complete system or provide supervision during installation
  • Testing and commissioning of the completed installation
  • Provide on- going service of the system